Infrastructure Construction
Power Line Transmission And Renewable Energy Projects
SGA is experienced at many different types of external lift operations, including:
- Foundation concrete pours
- Transformer Removal
- Cell tower placement
- Transmission and power pole placement and transformer removal
- Emergency debris removal and restoration work
- Large scale project construction material transport
- Pipeline placement
Our aircraft have been called an "I-beam with an engine" because of their excellent strength and reliability for repetitive lift operations. SGA’s aircraft are also ideally suited for long term construction projects that demand aerial transport of materials because of their high reliability, lean fuel burn, and optimum performance in difficult “hot and high” conditions.
We also utilize our light Astar B2 for construction lift work, including powerline support work.








